Capacity check

Phase one is the service the building already has. The upgrade path sits beside it, with the lead time attached. Every step of the arithmetic is on screen.

lights, HVAC, wash bay, tools, IT

How many of your vehicles this site could take today, and what remains available after an upgrade.

Cybercab certified
156vehicles
On 800 A existing serviceDerived
Used Model Y
91vehicles
Same site, alternative vehicleDerived

What this site supportsDerived

PhaseServiceVehiclesTime to operating
Today800 A existing156Weeks
Upgrade1,200 A24918 to 36 months, transformer procurement
Upgrade1,600 A34318 to 36 months, transformer procurement

Start on the service that exists. Upgrade once the site is earning.

PowerPass
LandUnknown
ZoningUnknown
Energy radiusUnknown

Zoning and energy radius require review. They are not screened by this tool.

See the arithmetic

The number above is yours with no email. The full arithmetic chain, land check and a one-page report open with an email address.

This is a screening estimate, not engineering advice. Service capacity, load calculations and code compliance for any specific site must be confirmed by a licensed electrical engineer and the serving utility before commitments are made.